Features: • Fold - back characteristics provides overload protection for external components• Burst operation under secondary short - circuit condition implemented• Protection against open or short of the control loop• Switch - off if line voltage is too low (undervoltage s...
ILA4605-2: Features: • Fold - back characteristics provides overload protection for external components• Burst operation under secondary short - circuit condition implemented• Protection agai...
SeekIC Buyer Protection PLUS - newly updated for 2013!
268 Transactions
All payment methods are secure and covered by SeekIC Buyer Protection PLUS.
| Parameter | Symbol | Limit Values | Unit | Notes | |
| min | max | ||||
| Voltages pin 1 pin 2 pin 3 pin 4 pin 5 pin 6 pin 7 |
V1 V2 V3 V4 V5 V6 V7 |
-0.3 -0.3 -0.3 -0.3 -0.3 -0.3 -0.3 |
3 V6 20 |
V V V V V V V |
Supply voltage |
| Current pin 1 pin 2 pin 3 pin 4 pin 5 pin 6 pin 7 pin 8 |
I1 I2 I3 I4 I5 I6 I7 I8 |
-1.5 -0.5 -5 |
3 3 3 1.5 0.5 3 3 |
mA mA mA A A A mA mA |
tp50µs; v0.1 * tp50µs; v0.1 tp50µs; v0.1 |
| Junction temperature | Tj | 125 | |||
| Storage temperature | Tstg | -40 | 125 | ||
The IC ILA 4605-2 controls the MOS - power transistor ILA4605-2and performs all necessary regulation and monitoring function in free running flyback converters. Because of the fact that a wide load range is achieved, this IC is applicable for consumer as well as industrial power supplies.
The serial circuit and primary winding of the flyback transformer are connected in series to the input voltage. During the switch - on period of the transistor, energy is stored in the transformer ILA4605-2. During the switch - off period the energy is fed to the load via the secondary winding. By varying switch - on time of the Power transistor ILA4605-2, the IC controls each portion of energy transferred to the secondary side such that the output voltage remains nearly independent of load variations. The required control information is taken from the input voltage during the switch - on period and from a regulation winding during the switch - off period. A new cycle will start if the transformer ILA4605-2 has transferred the stored energy completely into the load.